|
|
|
|
|
|
 |
Брест |
+6.0°C |
 |
Витебск |
+7.8°C |
 |
Гомель |
+7.8°C |
 |
Гродно |
+7.3°C |
 |
Минск |
+8.9°C |
 |
Могилев |
+7.1°C |
| По данным Гидрометцентра Республики Беларусь |
|
|
|
| 29.08.09 |
|
In September, 1st-4th the largest building exhibition in Belarus "Budpragres-2009" took place in Minsk. The Open Joint-Stock Company “Plant of Expanded-Clay Gravel Novolukoml” participated in this prestigious international building exhibition. It was the seventeenth time the exhibition has taken place this year. The event enjoyed prestige with both Belarusian and foreign participants and visitors.
Details
|
| 28.08.09 |
|
The manufacture of 13-slot-hole expanded-clay concrete blocks 400 mm wide is developed. In accordance with the Production Test Report made by the Research Republican Unitary Enterprise “Institute BelNIIS” of the Ministry of Architecture and Construction of August,
Details
|
| 25.04.09 |
|
In April, 21st-25th, 2009 the Open Joint-Stock Company “Plant of Expanded-Clay Gravel Novolukoml” took part in the International Building Exhibition "IBF-2009" in Brno, Czech Republic.
Details
|
| 24.04.09 |
|
In April, 24th 2009 the Test Division - Quality Control Service of the Open Joint-Stock Company “Plant of Expanded-Clay Gravel Novolukoml” was granted a certificate of technical competence.
Details
|
| 23.03.09 |
|
In March, 17th- 20th 2009 the Open Joint-Stock Company “Plant of Expanded-Clay Gravel Novolukoml” took part in the 12th International Specialised Exhibition “Stroyexpo – 2009”. The plant was presented with a Diploma for the reliability and high quality of the exhibited products.
Details
|
|
|